We are excited to share that on Sunday, April 6, 2025, we broke ground on our new sanctuary! It is our prayer that God will bless this endeavor and that this addition will bless our members and the surrounding community. We invite you to come and see how God is working within Ottawa Reformed Church! We give all the glory and honor to God!


Construction has begun!! April 2025









The new handicapped ramp
Removing the grass island and steps
Removing the carport
South end
Fill for new sanctuary
May 2025


Trenching for the footings
for the new sanctuary
Trenching for the footings
for the new sanctuary
May 12, 2025

Preparing for the footings for the
East side of the new sanctuary

Pouring the footings for the
South side of the new sanctuary




Pouring the footings alongside
the Meeting Grounds
Pouring the footings for the
East side of the new sanctuary
Pouring the footings alongside
the Meeting Grounds
Poured footings for the
East side of the new sanctuary
May 16, 2025

Pouring the South
sanctuary wall

Every little boy's dream!
A great big sandbox!

Forms for the West side of the sanctuary

Pouring the South sanctuary wall

The ramp was built to get the excavator
into the sanctuary

New carpet in the GRACE Center gym
May 23, 2025

Whatcha thinking, Pastor Jim?

Windows of the current offices will
become part of the women's restroom

West side of the church

Standing on the South wall of
the new sanctuary looking North
June 10, 2025

The new sanctuary facing west

Placing the beams

Placing the beams

This is the
doorway to the
men's bathroom
June 19, 2025

The new sanctuary facing north

The new sanctuary facing northeast

The new sanctuary facing west

The new sanctuary facing north

The new sanctuary facing west

The new sanctuary facing north
June 26, 2025

Steel walls are going up!





July 10, 2025





July 15, 2025


Laying pipeline for the roof's water removal
Pipeline facing north

Facing east

Facing northwest

Drive up canopy

Facing north
July 17, 2025

This will be the new Hospitality Center

Looking north from the south wall of the new sanctuary

Looking south into the sanctuary
July 23, 2025

New concrete poured! Facing south

New concrete poured! Facing east

New concrete poured! Facing north

New concrete poured! Facing west
July 31, 2025




East side
South side
West side
South wall of the sanctuary, building the stage

The new lobby area

Looking into the sanctuary from the lobby
August 7, 2025

The new lobby area looking east

Stage and stairs on the south wall

Look at these stunning windows!
They have a cross design!

East wall and the beautiful cross windows

The brick on the east wall is complete

Brick laying continues on the south wall
Brickwork has started on the east side of
the new sanctuary
August 14, 2025








The current sanctuary sliders are being replaced
with stationary windows and a new exit door
The current sanctuary sliders are being replaced
with stationary windows and a new exit door
Brickwork has started on the east side of
the new sanctuary
Brickwork continues on the south side of
the new sanctuary


Windows on the east side of
the new sanctuary have been installed
Drywall is being installed on the west wall
of the new sanctuary
Roll-up fire doors have been installed
Drywall is being installed
on the east wall
of the new sanctuary
August 21, 2025

The new windows and exit door are complete

Brickwork continues on the west side


Brickwork is complete on the south side
The east entrance doors are being installed

Vertical siding is being installed on the north side

The stage storage area is being framed in
on the west side

The stage storage area is being framed in
on the east side

The drywall on the sanctuarys' north wall
is being taped

The stage storage area on the west side

The stage storage area on the east side
August 28, 2025









Brickwork continues on the east side
Stone caps have been placed on top
of the brickwork and windowsills
The wing walls on the front of the church have been removed. They will be replaced with new brick.
Bricks are being laid to surround the columns of the west entrance
Brickwork continues on the west side
North wall of the new sanctuary
Framing on the east side of the stage area continues
Drywall installation continues in the new lobby
The sound booth in the new
sanctuary is being framed
September 4, 2025

Reroofing of the current sanctuary is underway.
The vertical siding on the north side of the
new sanctuary is complete.


Vertical siding on the west side of the new sanctuary is in progress
Reroofing of the current sanctuary is underway


Storage area on the east side of the stage
The sound booth

The stage
September 11, 2025

Work continues on the roof and vertical siding
on west side of sanctuary is complete

Vertical siding is complete on the south side.
Work continues on the soffit.

Electrical work continues inside.
Drywall continues and priming has begun.
September 18, 2025


New carport looking south
New carport looking north



New carport roof and entrance
New lobby looking west
from the east entrance
Southwest side of the new sanctuary


Southeast side of the new sanctuary
The new Hospitality Center

North wall of the new sanctuary.
The sound booth is on the left.

East wall of the new sanctuary
September 25, 2025


The vertical siding on the new carport is complete. Light fixtures have also been installed.
The vertical siding is complete on the south side of the new sanctuary.
Light fixtures have also been installed.






The installation of vertical siding on the east side of the new sanctuary continues. Light fixtures are also being installed.
The ceiling in the new sanctuary is being sprayed with acoustic foam insulation.
The ceiling in the new sanctuary is being sprayed with acoustic foam insulation.
The wood area is being prepared for stacked limestone
The west side backstage
storage area
The wood area is being prepared for stacked limestone
October 2, 2025







Adding fascia
Progress on the west
entrance car ramp
Southwest side of the new sanctuary
The wheelchair ramp is now facing north to
make room for a permanent structure
The grid for the ceiling in the new
sanctuary is being installed

New lobby looking east
The grid for the ceiling in the new
sanctuary is being installed
Southeast side of the new sanctuary
October 9, 2025








Fascia work continues
The roof is complete!
Still waiting on the panels to finish the vertical siding by the east entrance
Interior door & window frames between the new sanctuary and the new lobby are being installed
The second set of door frames on the new east and west entrances are being installed. The ceiling gridwork in the new lobby has begun.
Interior door & window frames between the new sanctuary and the new lobby. Looking north.
Ceiling gridwork in the new sanctuary continues.
Interior door & window frames between the new sanctuary and the new lobby are being installed.
October 16, 2025


Snow melt is being installed on the new handicap ramp
Snow melt is being installed on the west side steps

Awnings were attached to the new sanctuary windows



Snow melt has been installed and concrete sidewalk has been poured
Snow melt has been installed and concrete sidewalk has been poured
The sidewalk on the south side of the new sanctuary has been poured
October 23, 2025











Asphalt and sidewalk on the east side of the new sanctuary
Wood trim is being installed on the beams in the new sanctuary
The wood ceiling cloud has been installed over the sta
Wood trim has been installed on the windowsills
The ceiling clouds are nearly complete
The ceiling clouds are nearly complete
Snowmelt steps and sidewalk at the west entrance
West carport and ramp
West ramp
The second layer of asphalt on the parking lot
October 23, 2025

All of the exterior doors have been installed







The exterior siding is complete
The exterior doors to the lobby have been installed
The ceiling in the lobby is being installed
(looking west)
The screen is being installed
The trim details are being installed in the sanctuary
The ceiling in the lobby is being installed (looking east)
The limestone is being installed (east side)